PLEASE WAIT.........
Home
Cedar Island Park
The Park
Construction
Models
Sort Park Models by Manufacturer
Sort Park Models by Type of model
Sort Park Models by Area of park
Sort Park Models by Storage Location
Model Construction Log
Models that I still want
Website audit for missing information
Websites
Manufacturers of models on this site
Information
Tools
Workbench
Desk Tools
Electric and Electronic Tools
Paint Shaker
3D Printer
Laser Cutter
Electronics
PicAxe
Arduino
Lighting & LEDs
Resistor Box
Faller 180730 Sound Module
Contact
About
Manufacturer
Faller
Stock #
384
Description
Mini-Golf course
Image
Quantity owned
1
Type
Game Booths
Area
Camping
Storage
(*ACG) *Completed Model - Campground
Notes
Size
20 x 13-13/16 x 2-13/32 17.9x11.5x6CM
Assembly
Spray painted and then weathered the building. I used Camo tan paint followed by a rust and then black wash.
More painting and weathering.
Roof was painted an orange/tan color, Similar to roofing tiles.
Lots of painting on this one. Grey primer.
Windows were glued in followed by real glass (Slide covers). Testors window glue will dry clear,
Walls assembled.
"Rock" painted, weathered and installed.
Testors clear glue was used to create the smaller windows.
Installing a Faller motor for the wheel. I usually do not use Faller motors as they are A/C, noisy, and they cannot be speed controlled. But in this very basic installation, it works.
Wheel installed and tested.
I lost the front steps to this model, so I created some using stacked wood scraps.
Painted the sink.
Painted the kitchen.
More wood bits to create steps.
Completed wood steps.
Assembled kitchen.
Added the railing.
"Stucco" using Faller "Sand".
Steps painted tan. Kitchen and sign installed.
Real glass (Slide covers" glued in place.
The right side of the building assembled.
Steps weathered.
Starting the course. Course was painted "Camo" green and edges highlighted in colors.
More holes.
....and more holes.
Installed LED lighting in the recesses and then covered them with Testors clear glue. The LED is lit in this picture.
More LEDs and assmbling the blackout mask.
The glue starts out white, but will dry clear.
Installing the blackout mask.
Sign boards added to the front.
Course obstacles are painted.
More glue as the first but shrank as it dried.
The course is almost complete.
Some parts of the course are elevated.
LEDs in the ceiling.
Installed the lower roof with lighting.
Testing the lights.
Final bits of the course.
Microscopic (almost) putters. Painted the handles.
Copper gutters painted on the roof.
Umberellas trimmed in red.
Stands painted aluminum.
Painting and assembling chairs, tables, and unberellas.
Installed dormers on roofs.
Chairs assembled.
Bases glued to the umberelas.
Clamping the lower roof in place.
Gluing and clamping the upper roof in place.
Back to Top